Grays Harbor PUD offers rebate programs that are designed to be flexible enough to meet the needs of small and large commercial, agricultural and industrial customers, as well as institutional customers such as schools and governments. Please find the Program, Measure, and Rebate.
Program | Measure | Rebate |
---|---|---|
HVAC | Heat Pump Upgrade | $150 per ton |
Heat Pump Conversion | $1000 per ton | |
Ductless Heat Pump Upgrade | $300 per ton | |
Ductless Heat Pump Conversion | $1000 per ton | |
Connected Thermostat | $200 per thermostat | |
Variable Refrigerant Flow System | $1000 per ton | |
Advanced Rooftop Control Unit | $100 to $225 | |
Weatherization | Ceiling Insulation | $1.35 per square foot |
Wall Insulation | $0.75 per square foot | |
Window Upgrade | $9 per square foot | |
Lighting | Existing Building Retrofit | Up to 50% of total project cost |
New Construction | $0.18 per kilowatt-hour (kWh) saved | |
Commercial Custom | VFD (pump, fan, compressed air) | Up to $0.18 per kWh |
Shell Measures | ||
New Construction | ||
Controls | ||
Commercial Refrigeration Measures | *Incentives may vary | |
Commercial Appliance | Kitchen Equipment | Up to $1750 |
Clothes Washer | Up to $125 | |
Heat Pump Water Heater | $300 or $600 | |
Smart Power Strips | $15 per unit | |
Energy Smart Industrial | Energy Manager/High Performance Energy Management | *See Program |
Strategic Energy Management | ||
Industrial Custom Measures | Up to $0.18 per kWh | |
Agricultural | VFD | Up to $60 per Horsepower (HP) |
Agricultural Custom Measures | Up to $0.18 per kWh |
Other measures not listed here, but listed in the Bonneville Power Administration's (BPA) most current Energy Efficiency Implementation Manual, may be offered at a rebate not to exceed the maximum BPA reimbursement. Please check individual guidelines for each individual program for specific requirements.
Grays Harbor PUD reserves the right to revise program rules and guidelines, including discontinuing all or part of the available incentives at any time and without prior notice. All projects, once approved, will be subject to the guidelines in place at the time of approval.